State Road Commission Projects
This page was last updated on September 25, 2011.
Following is a list of Utah State Road Commission projects approved by the Utah Public Utilities Commission.
1924
State Road Commission received Utah PSC approval to construct the viaduct for Riverdale Road over the south end of UP's Riverdale Yard in Ogden. First proposed in May 1919 with the costs being equally shared by the state and the railroad. In April 1920 the federal government was asked to assist in the construction. The federal government requested a 20 foot roadway, instead of an 18 foot roadway, and a 5 foot sidewalk, instead of a 4 foot sidewalk. Construction was delayed throughout 1921 and 1922. The bridge was finally completed in 1924. (PUC/PSC Case No. 515)
March 27, 1924
State Road Commission received Utah PSC approval to construct a subway under the D&RGW tracks at Price. Project No. FAP 24‑C Carbon County. (PUC/PSC Case No. 659)
July 1930
State Road Commission received Utah PSC approval to construct a concrete bridge for U. S. Highway 91 over the UP's tracks at 30th Street in Ogden, replacing a wooden structure. (PUC/PSC Case No. 1176)
(no date)
State Road Commission received Utah PSC approval to construct a concrete overpass over the Union Pacific Railroad and the Western Pacific Railroad for a new state highway, called the Garfield Cut‑off. (PUC/PSC Case No. 1263)
(no date)
State Road Commission received Utah PSC approval to construct a concrete overpass bridge for U. S. Highway 50 over the D&RGW at Moark, at the mouth of Spanish Fork Canyon. Project No. FAP 73‑F. (PUC/PSC Case No. 1282)
November 9, 1932
State Road Commission received Utah PSC approval to construct a concrete overpass bridge for U. S. Highway 50 over the D&RGW tracks near Colton. Project No. FAP 95‑D. (PUC/PSC Case No. 1291)
March 2, 1934
State Road Commission received Utah PSC approval to construct a concrete subway for U. S. Highway 91 under the Bamberger Railroad
in south Bountiful (now the 2nd West crossing of 5th West). The crossing is where the most intense highway traffic in the state, at 5,000 cars per day, crosses the most intense railroad traffic in the state, at 30 trains per day. Bamberger calls the station "Parkins". (PUC/PSC Case No. 1512)
March 25, 1935
State Road Commission received Utah PSC approval to construct a concrete subway for State Street under the UP and D&RGW tracks near Midvale. Project No. NRH 119‑H (1935). (PUC/PSC Case No. 1725)
November 9, 1935
State Road Commission received Utah PSC approval to construct a concrete subway U. S. Highway 30 under the UP and UIC tracks, north of Brigham City. Project No. WPGH 38‑A (1936). (PUC/PSC Case No. 1807)
May 25, 1936
State Road Commission received Utah PSC approval to construct a concrete subway for U. S. Highway 50 under the D&RGW tracks at Springville. Project No. NRH 37‑A. (PUC/PSC Case No. 1828)
October 6, 1936
State Road Commission received Utah PSC approval to construct an overhead crossing for U. S. Highway 189 over the tracks of UP's Park City Branch at Wanship. Project No. WPGH 76‑E. (PUC/PSC Case No. 1829)
December 22, 1936
State Road Commission received Utah PSC approval to construct a concrete overpass bridge for the Garfield‑Saltair Highway over the tracks of LA&SL and WP. Project No. WPGM 201. (PUC/PSC Case No. 1895)
December 30, 1936
State Road Commission received Utah PSC approval to construct a concrete subway for Janet Street under the tracks of D&RGW in Helper. Works Program Project No. WPGM 202. (PUC/PSC Case No. 1872)
January 8, 1937
State Road Commission received Utah PSC approval to construct a concrete overhead viaduct crossing for Center Street (State Highway 114) over the UP and D&RGW tracks in Provo. U. S. Works Program Grade Crossing Project No. WPGM 203. Using 100% federal funds. (PUC/PSC Case No. 1871)
September 23, 1937
State Road Commission received Utah PSC approval to construct a concrete overpass bridge for Wasatch Boulevard over the tracks of D&RGW, at the mouth of Parleys Canyon, to connect with U. S. Highway 40. Later called the Stillman Bridge. Works Program Project No. WPSO 197‑B, "Parley's Canyon Bridge". (PUC/PSC Case No. 1933)
June 7, 1938
State Road Commission received Utah PSC approval to construct a concrete overhead viaduct for U. S. Highway 89 over the tracks of D&RGW's Marysvale Branch at Hilltop. Federal Aid Grade Crossing Project No. FAGH 72‑G (FAP‑72). The road was gravel at the time. (PUC/PSC Case No. 2074)
June 7, 1938
State Road Commission received Utah PSC approval to construct a concrete overhead viaduct for U. S. Highway 189 over the tracks of D&RGW in Provo Canyon. Both the railroad and the highway have been relocated due to the construction of Deer Creek Dam and Reservoir. Federal Aid Grade Crossing Project No. FAGH 65‑C. (PUC/PSC Case No. 2075)
February 18, 1941
State Road Commission received Utah PSC approval to construct a concrete grade seperation bridge for the D&RGW's Park City Branch over U. S. Highway 40 at Altus. Project No. FAGH 49 (2) (3), "Altus Underpass". (PUC/PSC Case No. 2446)
(no date)
State Road Commission received Utah PSC approval to construct underpass subways for the access roads to Hill Field, under the tracks of the Bamberger Railroad at Clearfield and Layton. (PUC/PSC Case No. 2470 and 2471)
September 4, 1942
State Road Commission received Utah PSC approval to construct a concrete overpass viaduct for 21st South (State Highway 201) over the tracks of D&RGW. 21st South is the main access road to the new Utah Ordnance Plant of the Remington Arms Company and the automobile traffic has increased greatly because of the war. Project No. AI‑FAP 218‑A (1), construction no. DA‑WI No.1 (1). (PUC/PSC Case No. 2610)
November 17, 1942
State Road Commission received Utah PSC approval to construct a level grade crossing for State Highway 68 over UP's Fairfield Branch, 3 miles south of Camp Williams. UP is operating 2 trains per week over the branch. (PUC/PSC Case No. 2631)
(no date)
State Road Commission received Utah PSC approval to a concrete via duct overpass for U. S. Highway 91 over the UP and UIC tracks at Hot Springs. Federal Aid Project No. SN‑FAGH 214‑F. (PUC/PSC Case No. 2768)
(no date)
State Road Commission received Utah PSC approval to construct a level grade crossing for 8th North over the tracks of the Bamberger Railroad. Project No. FAGM 65‑A (1), FAP No. 165B. (PUC/PSC Case No. 2809)
Also from Case No. 2809, following are the numbers for other projects in the vicinity:
‑ WPMS No. 165‑A: Victory Road, from Beck Street to the State Capital.
‑ FAGM 220‑A (1): Bamberger crossing at 4th North.
‑ FAGM 220‑B (1): UP crossing at 4th North.
‑ FAGM 220‑C (1): D&RGW crossing at 4th North.
‑ FAGM 60‑A: Bamberger crossing at 4th North in Bountiful.
‑ FAGM 61‑A: UP crossing at 4th North in Bountiful.
‑ FAGS 58‑B (1): Bamberger crossing at Pages Lane.
‑ FAGM 231‑A (1): Bamberger crossing at Porters Lane.
May 2, 1945
State Road Commission received Utah PSC approval to construct underpass subway for the Ogden Arsenal Entrance Road under the Bamberger railroad at Sunset. Federal Access Road Project No. DA‑WR 156 (1). (Utah PSC No. 2832)
***